RAF Syerston

Client : Babcock / Defence EstatesProgramme : 15 weeksValue : £250k Download Case Study OVERVIEW A Second World War Lancaster bomber hangar measuring 100m long by 50m wide & 15m high, scheduled for demolition to make way for the development of a new flight...

Heathrow Terminal 4

Client : BAA / Taylor Woodrow Value : £1.8m Download Case Study Overview The existing canopy roof construction was 50mm thick paving slabs with high density foam insulation, mastic asphalt waterproofing and concrete Holorib type slab. Scope of Works As part of the...

Willesden Euro Terminal HS2

Client : Costain Skanska JV Programme : 38 weeks Value : Confidential Download Case Study OVERVIEW HS2 is building a new high speed railway to link people across Britain, with over 25 stations connecting 30 million people and is one of the most demanding and exciting...

Gatwick Hangar 5 & PL 7 Building

Client : BAA Gatwick / Taylor Woodrow Programme : 18 weeks Value : £250,000 Download Case Study Overview Existing Structure & Location: Hangar 5 & PL7 Buildings were industrial buildings, originally constructed to provide an aircraft hangar, maintenance...

Shredded Wheat Factory

Client : Plutus EstatesProgramme : 32 weeksValue : £1.5m Download Case StudyLOCATION & OVERVIEW The project consisted of 33 acres split over 2 sites. The North site contained the former 1920’s Shredded Wheat Factory of which the original factory and silos were...