by hadimarashy | Oct 1, 2020 | Case Studies, Land Remediation
Client : D S Smith Programme : 3 years Value : £4.5m Download Case Study As Principal Contractor John F Hunt was required to demolish and remediate a former paper mill, comprising a large number of tightly arranged structures, pipelines, ducts, pits and soak-aways in...
by hadimarashy | Sep 29, 2020 | Case Studies, Land Remediation
Client : Defence Estates & Babcock DynCorp Programme : 4 weeks Value : £1.8m Download Case Study Overview RAF Woodbridge is a former military air base situated to the east of Ipswich. As part of the decommissioning of this WW2 airfield, Defence Estates objective...
by hadimarashy | Sep 28, 2020 | Case Studies, Land Remediation
Client : Aquila Holdings Limited Programme : 13 month Value : £9m Download Case Study Overview Historically, the site was occupied by Ransoms Cranes works, manufacturers of overhead and mobile cranes, which by 1926 had extended across much of the 44 acre site....
by hadimarashy | Sep 27, 2020 | Case Studies, Industrial
Client : Babcock / Defence EstatesProgramme : 15 weeksValue : £250k Download Case Study OVERVIEW A Second World War Lancaster bomber hangar measuring 100m long by 50m wide & 15m high, scheduled for demolition to make way for the development of a new flight...
by hadimarashy | Sep 27, 2020 | Case Studies, Industrial
Client : BAA / Taylor Woodrow Value : £1.8m Download Case Study Overview The existing canopy roof construction was 50mm thick paving slabs with high density foam insulation, mastic asphalt waterproofing and concrete Holorib type slab. Scope of Works As part of the...
by hadimarashy | Sep 26, 2020 | Case Studies, Industrial
Client : Costain Skanska JV Programme : 38 weeks Value : Confidential Download Case Study OVERVIEW HS2 is building a new high speed railway to link people across Britain, with over 25 stations connecting 30 million people and is one of the most demanding and exciting...