Silverton Mill – Redirection

Client : D S Smith Programme : 3 years Value : £4.5m Download Case Study As Principal Contractor John F Hunt was required to demolish and remediate a former paper mill, comprising a large number of tightly arranged structures, pipelines, ducts, pits and soak-aways in...

Futura Park Development

Client : Aquila Holdings Limited Programme : 13 month Value : £9m Download Case Study Overview Historically, the site was occupied by Ransoms Cranes works, manufacturers of overhead and mobile cranes, which by 1926 had extended across much of the 44 acre site. It...

RAF Syerston

Client : Babcock / Defence Estates Programme : 15 weeks Value : £250k Download Case Study OVERVIEW A Second World War Lancaster bomber hangar measuring 100m long by 50m wide & 15m high, scheduled for demolition to make way for the development of a new flight...

Heathrow Terminal 4

Client : BAA / Taylor Woodrow Value : £1.8m Download Case Study Overview The existing canopy roof construction was 50mm thick paving slabs with high density foam insulation, mastic asphalt waterproofing and concrete Holorib type slab. Scope of Works As part of the...

Willesden Euro Terminal HS2

Client : Costain Skanska JV Programme : 38 weeks Value : Confidential Download Case Study OVERVIEW HS2 is building a new high speed railway to link people across Britain, with over 25 stations connecting 30 million people and is one of the most demanding and exciting...