by hadimarashy | Sep 19, 2020 | Case Studies, Concrete Cutting Case Studies
Client : RMSProgramme : 12 weeksValue : £125k Download Case Study OVERVIEW Careys were awarded a design and build contract to construct a precast encapsulation structure over the existing DLR lines at Bank Station exit tunnel. The completed encapsulation structure...
by hadimarashy | Sep 18, 2020 | Case Studies, Concrete Cutting Case Studies
Client : Costain Laing O’Rourke JV Programme : 6 months Value : £150k Download Case Study OVERVIEW The construction of a passenger transfer link between the Crossrail and Bakerloo Line Stations at Paddington. The work involved the construction of a 250m...
by hadimarashy | Sep 17, 2020 | Case Studies, Concrete Cutting Case Studies
Client : Manhattan Loft Corporation Programme : 2 years Value : £160k Download Case Study OVERVIEW The London property developer, Manhattan Loft Corporation selected Bouygues UK, for the construction of the Manhattan Loft Gardens, a 143-metre landmark tower in...
by hadimarashy | Sep 16, 2020 | Case Studies, Concrete Cutting Case Studies
Client : D.P. WorldProgramme : 26 weeksValue : £570k Download Case Study OVERVIEW London Gateway is a unique development that combines the UK’s newest deep-sea container port with Europe’s largest logistics park, using world-leading technology to increase productivity...
by hadimarashy | Sep 15, 2020 | Case Studies, Demolition Case Studies
Client : Hutchinson Property Group Ltd Programme : 12 weeks Value : £123k Download Case Study OVERVIEW Demolition of two warehouses down to ground level at Convoys Wharf, in Deptford, a 16.6 hectare derelict brownfield site. With almost 500 metres of river...
by hadimarashy | Sep 13, 2020 | Case Studies, Concrete Cutting Case Studies
Client : Transport for London Programme : 3 years Value : £60k Download Case Study OVERVIEW As part of the road modernisation plan, Transport for London invested £32m to replace the Ardleigh Green bridge which carries the A127 Southend arterial road over the East...