by hadimarashy | Oct 20, 2020 | Case Studies, Demolition Case Studies
Client : MarickProgramme : 36 weeksValue : £2.3m Download Case Study Overview Located along the densely pedestrianised area of Fenchurch Street adjacent to both Fenchurch Street Station and the busy area of Aldgate. The project comprised of the demolition of the main...
by hadimarashy | Oct 18, 2020 | Case Studies, Demolition Case Studies
Client : Crossrail Programme : 18 Months Value : £6.3m Download Case Study Overview The Liverpool Street Crossrail project was split into three separate site locations, all were within close proximity of Liverpool Street or Moorgate Station. Each site had its...
by hadimarashy | Oct 16, 2020 | Case Studies, Demolition Case Studies
Client : Linseed Value : £3.95 M PCSA Duraton: 23 weeks Works Duration: 38 weeks Download Case Study Overview Existing Structure & Location: For many years 48 Leicester Square has been an iconic island site landmark which dominates the western side of the...
by hadimarashy | Oct 14, 2020 | Case Studies, Demolition Case Studies
Client : British Land Programme : 70 weeks Value : £6.5 M Download Case Study Overview This high profile project direct for British Land represented the first buildings to be demolished within the iconic 1980’s built Broadgate Circle Development and were the original...
by hadimarashy | Oct 13, 2020 | Case Studies, Demolition Case Studies
Client : Exemplar Properties (ph1 works) Programme : 70 weeks Value : £4.8m Download Case Study Overview The former Lybian Embassy, No. 6 St James Square, was a 6 storey reinforced concrete brick clad Structure, which required demolition to the top of the ground...
by hadimarashy | Oct 10, 2020 | Case Studies, Concrete Cutting Case Studies
Client : Cleshar Contract Services Group Value : £46,000 Download Case Study Overview Moorgate Underground Station in London has some 100,000 passengers passing through the building daily. Any works carried out on the escalator inclines whilst the station is...