Flybrid Peak Power 200: Revolutionising Energy Solutions

28th November 2024
Team members assembling sustainable garden furniture from reclaimed wood at Ebury Bridge Estate

John F Hunt Power is revolutionising energy solutions by introducing the innovative Flybrid Peak Power 200, a cutting-edge system transforming power delivery to dynamic loads.

The Flybrid stores kinetic energy during low-load periods and releases up to 120 kW of power during peak demand. This enables smaller, more efficient generators to take over, significantly reducing costs, emissions, and environmental impact.

Built from low-carbon materials and rigorously tested through millions of cycles, it offers a reliable, sustainable solution across various industries, including construction, for instance during crane startups, HVAC, oil and gas, and more.

Want to learn more? Visit our website here: 🌐 Flybrid Units or see it in action on YouTube:  Flybrid Video

At John F Hunt Power, we’re proud to deliver innovative solutions that drive efficiency and sustainability forward!