Page 18 - PowerPoint Presentation
P. 18
Let’s all
WORK PLACE ACCESS get home safely,
every day
External ‘Haki System’ used as the primary
access route, avoiding use of scaffold
ladder access wherever possible. Establish
two means of access and egress.
Access to all building levels and
onto the floors must be
controlled at the entry point,
with an ‘escorted’ entry system
in place.
Develop and continually review a site logistics plan showing:
Crossing points should be clearly identified, with
1. Vehicle entry points and pedestrian entry points. warning notices for pedestrians and vehicles with
2. Access/ egress routes. traffic calming measures in place.
3. Excluded zones.
4. Storage areas.
5. COSHH areas.
6. Fire points and site muster point.
PROPPER PLANNING AND ONGOING REVIEW OF SITE LOGISTICS IS THE KEY TO
GOOD SITE ORGANISATION.
Scaffold ladders used as
Sites are to conduct a daily coordination meeting to continually ensure that secondary means of
logistics are maintained to the highest of standards. access and escape. DO
NOT use as a primary
AN A1 LOGISTICS PLAN IS TO BE DISPLAYED ON SITE NOTICE BOARDS AND means of access.
UPDATED AS REQUIRED USING DRY WIPE MARKERS.
Page 16