Page 63 - PowerPoint Presentation
P. 63

Let’s all
                              EDGE AND VOID PROTECTION                                                            get home safely,
                                                                                                                  every day






       Materials should be restrained so that
       they cannot be displaced and never
       stored within 1m of a live edge.
                                                          Edge protection must be a minimum of
                                                          950mm high and have an intermediate
                                                          handrail and toe board. Mesh panels or
                                                          brick guard should be used to provide a
                                                          more robust system.
                                            1m











                                All voids in slabs must be protected with a
                                designed solution agreed prior to the
                                works commencing. This may be a mesh
                                or GRP solution. The method of void
                                protection will be stipulated within the
                                task specific RAMS.                         Small penetrations in
                                                                            the slab will be
                                                                            protected with an
                                                                            18mm ply cover
                                                                            (below 450mm). The      A void register is to be developed clearly
                                                                            lid will be recessed    giving the location of each protected
                                                                            into the concrete or    void on the project. Voids are subject to
                                                                            chamfered if above      a daily inspection.
                                                                            the level of the slab.


                                                                     Page 61
   58   59   60   61   62   63   64   65   66   67   68