P. 9
Let’s all
BRIEFINGS AND COMMUNICATION get home safely,
every day
PERMITS TO WORK PROJECT PLANS (CPP, CEMP, SITE
WASTE MANAGEMENT PLANS)
Other documents that
Permits to work will be issued for specific DAILY ACTIVITY An overview of the project and its associated
operations as a control based hold point (list is not risks covering items suchas: must be briefed to
exhaustive). a. Site rules Operatives as part of the
1. Hot works, BRIEFINGS b. Emergency procedures safety systems
2. Confined space c. Communication and workerengagement
3. Permit to load structure or temporary works. Conducted by each section Supervisor procedures 1. Lifting operations
4. Permit to break ground / dig using the daily safe start briefing at a pre d. Welfare plans:
5. Permit to work at height. agreed location. These daily briefings e. Environmental information Developed by an AP
6. Permit to demolish allow operatives to receive up-to-date f. Disciplinary procedures and briefed to lifting
g. Site logistics
safety, environmental and quality h. High riskactivities teams by either the
information before commencing the days Crane Supervisor or a
Ground Works
work. Supervisor, where
excavators are used
as lifting equipment.
2. COSHH assessments:
To be included into
relevant safe systems
of works.
TOOL BOX TALKS / METHOD STATEMENTS / RISK TASK BRIEFINGS
SAFETY ALERTS ASSESMENTS 3. HAV assessments:
Briefed to operatives
These are task specific briefingstargeted at Method statements must be task specific and Task briefings can be used to break down briefing prior to the use of
either an individual operation on site, or the developed via a risk review process. sections of the RAMS to smaller more vibrating tools
manageable briefings, when dealing with large
specific use of materials and equipment such as: multi discipline safe systems of works. ensuring they are
RAMS must be relevant to the ongoing operations aware of the EAV and
a. Reducing the use of ladders and and reviewed regularly, or prior to any change in Additionally, these can be used to manage small ELV.
alternative systems. the working practice or environment. changes / deviations from a developed safe
b. Use of fall arrest / restraint systems. system of works e.g. a short term change to the 4. Rescue plans:
c. Use of powertools. All operatives MUST be briefed and sign the safe safe working practice.
d. Edge protection. system of works. Re-briefing must take place Specific rescue plans
e. Environmental issues. regularly or after any prior revision of the RAMS. Task briefings must be linked to an approved will be developed and
RAMS and accompanied by a risk assessment briefed to operatives
These toolbox talk safety alerts are developed detailing any changes to the risk profile of the for works at height,
either as a proactive or reactive measure to site A safe system of works and associated risk task, or the individual operation. MEWP use and
issues. assessment must be developed prior to the
commencement of any works. confined spaces.