Page 76 - PowerPoint Presentation
P. 76
Let’s all
BROKK USE FOR DEMOLITION WORKS get home safely,
every day
1 A pre start inspection of the
Brokk must be undertaken
by a trained, competent
operative with any faults
reported immediately.
Ensure there are no visible
signs of damage, faults to
plugs, components or
electrical cables and no 4
hydraulic leaks. 3
2 1
2 The Brokk must be sited 6
within a exclusion area
(physical barriers as per the
JFH standard) with sufficient 5
distance from other works as
per the risk assessment and
safe system of works.
3 Hearing protection must be 5 Dust suppression must be 7 All works are to be
worn and signage employed via either water or carried out under a Permits
displayed around the areas extraction systems. permit to demolish, to Work
of works warning others. ensuring service
check, structural
6 Outriggers must be stability and the
4 Cable management must deployed (when fitted to condition of the
working area.
be maintain. Ensure cable the machine) and a full
is not damaged by the assessment of ground
movement of the Brokk or conditions / slab loadings
that it presents a trip hazard carried out prior to using
to others in the area. the Brokk.
Page 74