GENERAL DEMOLITION SAFETY PROCEDURES get home safely,
every day
A structural survey of the building must
be undertaken before work commences
Housekeeping and to ensure that the vital factors such as
stockpile management Dust suppression via how the structure has been constructed,
of processed waste is Motofog or similar is to the system of cladding used or the
to be maintained to be applied throughout possible presence of post tensioning are
the highest standards. demolition works . considered at the planning and
preparation stage of works.
Prior to demolition a demolition permit
must be completed and issued to the
site team.
At no time shall any major refurbishment
or demolition work commence on site
until a full Asbestos
Refurbishment/Demolition Survey is
All operatives must be available on site.
briefed and fully aware
of the controls regarding
people plant interface.
Demolition areas are to be
excluded via a physical barrier
preventing any unauthorised
access throughout works (see
demolition exclusion zone
Operatives must be CCDO standard)
certified and teams must ensure
they have the correct skills,
knowledge attitude and
experience.
Ensure supervisors have successfully Public protection is critical and must
attended and passed the 5 day be considered and maintained at
CCDO supervisors demolition every phase of the demolition works.
course.