                              HIGH REACH EXCAVATORS                                                               get home safely,
                                                                                                                  every day






          A structural survey of the building must be undertaken before
          work commences to ensure that the vital factors such as how                The Machine operator must ensure that the attachment is
          the structure has been constructed, the system of cladding used            angled downwards or straight into the building when cutting
          or the possible presence of post tensioning are considered at              pulverising or shearing.
          the planning and preparation stage of works.








                                                                                                        Ensure that debris and material are constantly
                                                                                                        cleared from floor as works progress.
                                                                                                        Failure to do so may result on overloading of the
                  High reach machines should be fitted with a                                           floor plates and structure collapse.
                  FOPS and FOGS protective cabin.














                                                                                                        A safe working area and an exclusion zone for
                                                                                                        the operation of high reach machines must be in
         The machine must be operated in line with the                                                  place and maintained at all times.
         tracks and over the front idlers (drive sprockets                                              When designing an exclusion zone the working
                                                                                                        radius of the machine should be a ratio of 2:1.
         to the rear) for maximum stability.  In addition                                               The base of the machine must be at least half the
         this will allow the machine to be reversed                                                     height of the building away from the face of the
         quickly in the event of falling debris.                                                        structure.