Page 14 - Visual Guidance Handbook
P. 14
Let’s all
PUBLIC FACING AREAS get home safely,
every day
The site hoarding is the first impression
anyone gets of our projects. This must be:
• Installed to an approved TW design.
• A minimum of 2.4m high.
• Viewing windows will be installed
when allowed. When possible
digital viewing screens will be
installed to the hoarding.
• Kept clean and maintained free
from damage.
• Regularly inspected with a weekly
recorded inspection carried out by
TWS (temporary works supervisor).
Clear signage identifying the site entrance Safety signage must be Traffic Marshals and gate Considerate
for pedestrians and visitors. Site contact displayed along the full operatives are public facing constructors
details and displayed F10, permissions, perimeter of the hoarding and therefore must maintain posters are to
consents and licences warning the public of the a professional image at all be displayed
activities within. times with pristine PPE.
on the
hoarding as
per the
requirements
set out by the
schemes
guide lines
Page 14