Page 75 - Visual Guidance Handbook
P. 75
Let’s all
ACCESS – DECKS UNDER CONSTRUCTION get home safely,
every day
Walkways across rebar should be a
continuation of existing walkways where
possible. Edge of slab and start of rebar should be segregated leading
operatives to the walkway and preventing unauthorised
access.
Steps to access should be of an
even height and depth.
Anti slip mats plywood or scaffold boards to
be placed end to end with no gaps to form a
walkway on reinforcement.
In adverse weather rubber mats should
Exposed rebar must be protected with caps be used on decking to avoid potential
of strip protector systems. slips.
Page 75