Page 75 - Visual Guidance Handbook
P. 75

Let’s all
                              ACCESS – DECKS UNDER CONSTRUCTION                                                   get home safely,
                                                                                                                  every day








                  Walkways across rebar should be a
                  continuation of existing walkways where
                  possible.                                                Edge of slab and start of rebar should be segregated leading
                                                                           operatives to the walkway and preventing unauthorised
                                                                           access.








                                                                                  Steps to access should be of an
                                                                                  even height and depth.





   Anti slip mats plywood or scaffold boards to
   be placed end to end with no gaps to form a
   walkway on reinforcement.










                                                                                                  In adverse weather rubber mats should
              Exposed rebar must be protected with caps                                           be used on decking to avoid potential
              of strip protector systems.                                                         slips.



                                                                     Page 75
   70   71   72   73   74   75   76   77   78   79   80