Page 70 - Visual Guidance Handbook
P. 70

Let’s all
                              CLIMBING SCREEN SYSTEMS                                                             get home safely,
                                                                                                                  every day




     Safe Screen System is a hydraulic                                                                        The system is to cover 4 x levels (1) wet
     climbing system.  This is to be installed on                                                             deck / live deck.  (2)  level with falsework
     structures where the risk assessment                                                   1                 in place.  (3)  back propped level (4)
     deems that there is a significant risk of                                                                struck level.
     falling materials or equipment.  Typically
     this will be used on high rise structures                                              2                 The system provides floor to soffit edge
     (structures exceeding 10 floors or where                                                                 protection and can be used to fully
     there is a proximity risk (e.g structure is                                                              enclose the structure or partially cover
     close to site perimeter or sensitive                                                   3                 high risk elevations.
     structures such as rail assets.
                                                                                                              System will be installed and operated by
                                                                                             4                trained and competent operatives with
                                                                                                              training provided by the system provider.



                                                                                                                  2 x integrated staircase’s are to be
                                                                                                                  incorporated within the screen.
                                                                                                                  This will remove the need for ladder
                                                                                                                  access between platforms and
                                                                                                                  allow for structural stairs to be
    Top platform to align                                                                                         excluded whilst under construction
    with falsework                                                                                                on the upper 4 x levels.
    construction
    removing the need                                                                                             Stairs locations are to be planned
    for cantilever sections                                                                                       to accommodate pour layout and
    of falsework.                                                                                                 maintain access to both the area
                                                                                                                  being poured and any area under
    Hinged trapdoors                                                                                              construction.  Falsework will
    provide seal with                                                                                             commence at a stairs location
    poured decks (these                                                                                           allowing for the stairs to be utilised
    must remain closed                                                                                            to access the deck under
    at all times with the                                                                                         construction eliminating the need
    exception of when                                                                                             for a ladder access to this.
    the screen is climbed.




                                                                        Anchors installed as per TW
                                                                        design and pre jump                        Page 70
                                                                        inspection / permit to be
                                                                        completed prior to all lifting
                                                                        operations
   65   66   67   68   69   70   71   72   73   74   75